This is an updated complete turn-key precious metal stripping-recovery system of E-waste materials recycling operations.
In the modified stripping system, two stripping cells replace the old model (one stripping cell). This modification significantly improves stripping system work performance and allows separate stripping of materials with different qualities.
With this package, the client will be able to process 1000 kg E-waste materials per day with a daily gold product of 400-500 grams (~ 20,000 USD daily revenue from gold alone).
Reviews
There are no reviews yet.